The Slab Is the One Thing You Cannot Do Again

Flatness and levelness are decided by placement and finishing on a single day, by one crew, in that morning's conditions. Afterwards nobody can improve them without grinding. A tenant will forgive a great deal and will not forgive a floor their equipment cannot work on — so it gets specified in numbers and measured, not described.

The geotechnical report, the intended clear height and the likely tenant profile. Those three tell us more than a full set of drawings.

ValleyHalf the water on the roof runs hereWall flashingWhere a roof meets a wallPenetrationsVents, stacks, skylightsEaveWhere wind lifts first

Four places account for most South Florida roof leaks. None of them is the middle of the roof.

The slab

The one element a tenant judges on, and cannot fix

Self-perform

Dewatering and deep foundations in house

Commodity

Fire protection designed to what is actually stored

Licensed

General contractor, licensed in the state of Florida

The difference

How we work

The slab is the building

A tenant will forgive a lot and will not forgive a floor their equipment cannot work on. Flatness and levelness are measured, specified and achievable — and they are decided by placement and finishing, which are decisions made on one particular day that cannot be revisited.

Fire protection follows what is stored, not what is drawn

The sprinkler design is determined by commodity classification and storage height. A building sprinklered for a general assumption and then leased to a tenant storing plastics needs a system upgrade, and that is a very expensive way to find out.

We self-perform the ground

Florida industrial sites are frequently wet, and dewatering and deep foundations are where schedules are lost. We do that work ourselves rather than subcontracting the largest risk on the job.

We will tell you the clear height will not pay for itself

More height costs money in wall, column and sprinkler design, and it only earns it back if the market will actually rack that high. On some sites it does and on some it does not, and we will say which.

Start here

Send us the site and the program

The geotechnical report, the intended clear height and the likely tenant profile. Those three tell us more than a full set of drawings.

If the ground will not support what the design assumes, we would rather say so before the height is fixed than after the budget is.

FAQ

Common questions

Can slab flatness be corrected later?
Only by grinding — expensive, disruptive and partial. It is specified in numbers and measured.
What decides the sprinkler design?
Commodity classification and storage height, which come from the tenant. A speculative building is making an assumption.
Can sprinklers be upgraded later?
Yes, in an occupied building, expensively, and usually as an argument about who pays.
How much clear height should we build?
What your submarket actually racks to. Extra height multiplies across wall, structure, foundations and sprinklers.
Can truck court depth be added later?
No. It is the one dimension that genuinely cannot be, and doors nobody can reach are worse than no doors.
Do you self-perform below-grade work?
Dewatering and deep foundations, yes. On a Florida industrial footprint that is the largest schedule risk.
Will you price without a geotechnical report?
Not below grade. It is the largest source of change orders in the sector.
Why is cold storage so different?
The vapour barrier, the refrigeration plant and under-slab heating. An ordinary warehouse approach fails outright.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.